We perform an important role as an advice agency for building work assessable against the Building Act 1975.

In the interests of a seamless, transparent Referral Agency Advice process, we have improved the following important forms:

  • Request for Meeting
  • Request for Comment on Fire Engineering Brief
  • Request for Assessment
  • Request for Inspection
  • Documentation Only submission

The below explains when to use these forms:

Request for Meeting

Use this form to request a meeting with us about a building approval. There are four types of meetings relevant to the building approvals process and these are explained in the following sections. 

CSO043 (DOCX, 371KB)

Preliminary meetings

A preliminary meeting is to discuss a building approval where the building design is deemed-to-satisfy or unknown, before an ‘Request for Assessment’ has been received by us.

A preliminary meeting can only be allowed on a job where there has been either no other activity or only previous preliminary meeting activity has occurred.

FEB/FER meetings

A FEB/FER meeting is to discuss a performance solution building approval before construction starts on the building.

Minor performance meetings

A minor performance meeting is to discuss a performance solution building approval once an assessment report has been issued and construction has started on the building.

BAO consultancy meetings

A BAO consultancy meeting is to discuss a deemed-to-satisfy building approval after we have received the ‘Request for Assessment’

Request for Comment on Fire Engineering Brief

To request that we review and provide comment on a Fire Engineering Brief.

CSO044 (DOCX, 620KB)

Request for Assessment

To request that we assess or reassess a building development application referral.

CSO020 (DOCX, 628KB)

Request for Inspection

Use this form to request that we inspect or reinspect a building. There are five types of inspection relevant to the building approval process that we can be requested to conduct.

CSO022 (DOCX, 379KB)

Interim Inspection

An interim inspection is a request to inspect one/many SFS prior to the SFS installation being completed.

Inspection for Staged Approval 

An inspection for staged approval is a request to inspect SFS within a part of a building so that a Certificate of Classification can be issued by the building certifier for that part of the building.

Additional Inspection

An additional inspection is a request to carry out another inspection of SFS (other than an interim inspection).

Inspection 

An inspection is a request to inspect one or more SFS in the building.

Re-Inspection 

A re-inspection is a request to re-inspect one or more SFS in the building following a non-compliant inspection.

Documentation Only Submission

Use this form to submit information pertaining to building works that meet the scope reduction criteria.

  • Building work involving fire hydrant coverage via a single street hydrant.
  • Building work involving particular performance solutions.
  • Building work involving particular fit-outs.
  • Building work involving particular free-standing shade structures.
  • Building work where fire hydrant coverage is via a single feed hydrant for a marina.

CSO080 (DOCX, 415KB)

Required Information

We require the following information for the assessment/reassessment of your referral:

  1. Request for Assessment (Form)
  2. Building Development Application Drawings
  3. Fire Engineering Brief (FEB) (if applicable)
  4. Fire Engineering Report (FER) (if applicable)

A report addressing the six performance recommendations detailed in our Fire Alarm and Building Design Guidelines for the Reduction of Unwanted Alarms.

Download further advice on fees associated with building development application referrals.

#143054